This project is an ideal example of how versatile decking is, a lot more labour intensive than say paving so as a result cheaper..
Orpington decking project..
For this
project in Orpington we were asked to create a raised deck area
to
overcome an old patio, We did this over two levels linked by
steps, the top level with handrails
for safety.
The project
took 4 days to complete and was constructed using our Snowdek® range.
The
slideshow below shows the
project through the various stages
of construction through to the finish.
Mouse over to
pause an image