This full design involved decking, two water features, turf,paving and covering a crib wall. A couple of days into the project the ground has been cleared, deck framework erected and path set out. This shows the framework of the main water feature, also the supports for the cladding to cover the crib. After ten days the finished project, a couple of extra days were required due to the weather! A split level deck helps to conquer the sloping ground. A small water feature set at the back of the decking. Some planting was carried out and mulching of beds. Top view from behind the waterfull. The new turf finishes the look. Contrasting colours complement the design. The waterfull create a dramatic effect with the water running over the slate. Rumbled sets were used for the pathway. The finished look complete with remote control of the lighting and water features.